Granular borrow
Web(2) Under the Select Borrow bid item furnish material conforming to the quality requirements specified in a required Select Borrow contract special provision. 208.2.2 Source (1) Obtain suitable borrow material from one or more of the following sources: 1. Contractor-furnished sources the engineer approves. 2. WebThe total quantity of Granular Borrow is summarized in cubic meters on the Earthworks Summary Sheet. Quantities shown should include a factor of 1.15 to allow for shrinkage. 203.33 – Rock Borrow. Rock Borrow (in cubic meters) may be specified to improve foundations or to provide slope stability. The total quantity is summarized on the ...
Granular borrow
Did you know?
WebThe granular borrow material shall be compacted to not less than 95% maximum dry density as determined by AASHTO T-180 (Modified Proctor) or as determined by ASTM D1557 (Modified Proctor). Surfaces shall be true to the established grade with thickness being not less than 1-inch from the required layer thickness and with the Web209 Granular Backfill 209.1 Description (1) This section describes furnishing processed or selected granular materials, where the plans designate, ... If measured in its original position, the department will calculate the quantity as specified for borrow in 208.4.2. Prepare the pit for measurement as specified in 209.2.4.
WebDec 26, 2012 · Granular borrow has a classification of A-1-a, it is non-plastic, it is well-graded, it meets AASHTO M 145, and it has a 3 inch maximum. Granular. UTAH DEPARTMENT OF TRANSPORTATION. WebGravel Borrow. Choose a Type. PRODUCT CODE: 1980-3. PRODUCT ORIGIN: King Creek Pit and Kapowsin Quarry. GET A QUOTE. Info. Pricing. residential projects. free-draining structural fill.
Web203.32 granular borrow cy $19.75 26 203.40 shoulder berm removal lf $0.30 42 204.20 trench excavation of earth cy $18.03 110 204.21 trench excavation of rock cy $139.85 59 204.22 trench excavation of earth, exploratory (n.a.b.i.) cy $74.84 278 204.25 structure excavation cy $24.11 99 204.30 granular backfill for structures cy $45.29 136 Webgranular borrow s.p. station to station total excavation total embankment include 2629 cu yd of topsoil excavation. embankment (cu yd) common 6862 (ev) = 1315 (cv) 9220 (ev) 1171 (cv) topsoil subgrade 2358 (ev) = 5493 (cv) 878 (cv) topsoil borrow special 1 5278 (cv) suitable grading
WebDefine granular. granular synonyms, granular pronunciation, granular translation, English dictionary definition of granular. adj. 1. Composed or appearing to be composed of granules or grains: granular sugar; granular snow.
WebOn projects involving borrow, granular borrow, or different schedules of excavation and embankment, the inspector should identify and locate the various quantities of each item placed. Diaries, notebooks, and sketches can be utilized to document this information. If profiles or cross-sections are required, extractor\u0027s kwWebaggregate cushionconsisting of Granular Borrow Material for Underwater Backfill (703.19).The toe of the riprap sections shall be keyed into the existing soils 1 foot below the streambed elevation. 6.4 Seismic DesignConsiderations In conformance with LRFD Article3.10.1, seismicanalysis is not required for buried structures, extractor\u0027s ofhttp://wmmueller.com/carver-pit.html extractor\\u0027s ktWebPlace granular borrow behind abutment in 1’-0" layers. Thoroughly compact each layer. Excavated material may be used if suitable. Place two ~9" layers of gravel borrow. Thoroughly compact each layer. Finish to match new cross section, transition with existing approach roadway. 1’-0" L Remove existing deck, superstructure and log abutments ... doctor reports underwriting incidentsWeb4630 (cv) 196531 (cv) granular 6999 (cv) 1257060 (cv) 88079 (cv) select granular 12556 (cv) sel. granular mod. 6999 (cv) pond liner granular 110342 (lv)/1.4 = 78816 (cv) select granular 123311 (lv/1.4 = 88079 (cv) select granular mod 10% 17578 (lv)/1.4 = 12556 (cv) 889350 (cv) embankment (cu yd) borrow (cu yd) excavation (cu yd) 971065 (lv)/1.4 ... doctor resignation ตอนที่ 19WebCalculate Rough Fill. Type in inches and feet of your project and calculate the estimated amount of Soil & Dirt in cubic yards, cubic feet and Tons, that your need for your project. The Density of Rough Fill: 2,410 lb/yd³ or 1.21 t/yd³ or 0.8 yd³/t. Type in your numbers. extractor\\u0027s ofWebMnDOT Standard Specifications for Construction 2024 Volume II - Division II (PDF) The 2024 edition is effective for most projects let on or after Jan. 27, 2024. All project documents submitted for the Jan. 27, 2024 letting, or later lettings, must be in accordance with the Standard Specifications for Construction, 2024 edition. doctor reporting medicaid fraud hipaa